GRAPHENE BUILDING, MANCHESTER

DETAILS

Client: Lakesmere

An example of how Mastclimbers, combined with a monorail system can be used in an innovative way to overcome site space issues.

With limited space to load and unload materials the monorail was used not just as way of lifting heavy materials for ease of installation, but also as a way of transporting goods around the building to load all of the mastclimbers with materials.

Goods were lifted from a loading area and moved around to each elevation as required saving both time and the expense of a tower crane.